Warning: Declaration of Walker_post_notification::start_lvl(&$output, $depth, $args) should be compatible with Walker::start_lvl(&$output, $depth = 0, $args = Array) in /home/jeniq/public_html/blog/wp-content/plugins/post-notification/functions.php on line 267

Warning: Declaration of Walker_post_notification::end_lvl(&$output, $depth, $args) should be compatible with Walker::end_lvl(&$output, $depth = 0, $args = Array) in /home/jeniq/public_html/blog/wp-content/plugins/post-notification/functions.php on line 274

Warning: Declaration of Walker_post_notification::start_el(&$output, $category, $depth, $args) should be compatible with Walker::start_el(&$output, $data_object, $depth = 0, $args = Array, $current_object_id = 0) in /home/jeniq/public_html/blog/wp-content/plugins/post-notification/functions.php on line 283

Warning: Declaration of TarskiCommentWalker::start_lvl(&$output, $depth, $args) should be compatible with Walker_Comment::start_lvl(&$output, $depth = 0, $args = Array) in /home/jeniq/public_html/blog/wp-content/themes/Tarski 2.4/library/classes/comment_walker.php on line 22

Warning: Declaration of TarskiCommentWalker::start_el(&$output, $comment, $depth, $args) should be compatible with Walker_Comment::start_el(&$output, $data_object, $depth = 0, $args = Array, $current_object_id = 0) in /home/jeniq/public_html/blog/wp-content/themes/Tarski 2.4/library/classes/comment_walker.php on line 50
I [heart] Davids · Project 1: Kitchen Redo – In Progress

Project 1: Kitchen Redo – In Progress

As a reminder, there are two parts to the our project in the kitchen: the tile backsplash and some new paint. The subway tile backsplash is in! We selected a paint color – Roast Coffee won.

So now comes the hard part, to paint the walls, and that’s been our task this weekend. Saturday morning we spent prepping the kitchen for painting. Prep is definitely the longest and most tedious part of the project, and we took our time hoping to get every piece of trim, edge and corner just perfect. Then Dave moved the fridge all by himself because he’s awesome, and I did some last minute caulking behind the fridge. After that we draped everything in plastic and then we finally got to painting!

Kitchen Paint Prep 1

Kitchen Paint Prep 2

Dave Painting Kitchen

Kitchen Paint In Progress

  1. Monica’s avatar

    Can’t wait to see the finished kitchen!!!!! Roast coffee sounds perfect for a kitchen.

  2. Ally’s avatar

    you learned that tape technique from me 😉